80 × 24 × 26 m Heavy Steel Concert Roof Truss

 

 

A Modular, TÜV Load-Tested Stage Roof for Australian Stadium Shows

 

Direct answer: This is a modular heavy steel concert roof truss system with an 80 m clear span, 24 m depth and 26 m working height, built from Q355B square hollow sections (100×100×5 mm chords, 60×60×5 mm webs, 48×3 mm round column bracing) and raised by 45-tonne thrust electric cylinders with a 1,200 mm stroke. The complete roof structure was erected and statically load-tested under witnessed TÜV Rheinland supervision to a total imposed load of 101.2 tonnes (300 kg/m²) across 39 survey points, and the wind design has been modelled to AS/NZS 1170.2:2011 for a NSW Region A1 site at 30 m/s maximum wind.

 

If you are an Australian promoter, tour production manager or staging supplier sizing a roof for a stadium or arena show, the three questions that decide your build are always the same: can it span the venue, can it carry the production, and can you prove it to the venue's structural engineer? This article answers all three with the actual test data, material certificates and component breakdown for this system.

 

At a glance: the numbers that matter on site

 

Parameter

Specification

Overall envelope (L × W × H)

80 m × 24 m × 26 m

Roof plan area

≈ 1,920 m²

Main steel grade

Q355B (GB/T 1591-2018), mill-certified per heat

Main chord sections

100 × 100 × 5 mm SHS

Web / diagonal sections

60 × 60 × 5 mm SHS

Column bracing

48 × 3 mm round tube

Roof arch profiles

6061-T6 aluminium extrusion

Lifting system

45 t thrust electric cylinder, 1,200 mm stroke

Column module

1 m (single-ear and double-ear variants)

Beam module

2 m and 4 m lattice units

Base

20a H-beam foundation shoe

Static load test

101.2 t total imposed (300 kg/m²), TÜV Rheinland witnessed

Wind design basis

AS/NZS 1170.2:2011, Region A1, 30 m/s max / 21 m/s operational

Height adjustment

1,200 mm per cylinder cycle, hook-locked

 

What the system is made of

 

The structure is a portal-frame family, not a single welded roof. Every element is a discrete module that can be handled by forklift or telehandler, stacked for transport and pinned together on site - which is what makes an 80 m span practical to tour.

The component kit breaks down into six groups:

Column units (single-piece columns)

1 m lattice modules supplied in two connection variants (single-ear and double-ear plates) so that adjacent units, tie bars and roof beams can share the same node. The column diagonals are 48 × 3 mm round tube; the chords are 100 × 100 × 5 mm SHS.

Beam units (single-piece beams)

2 m and 4 m lattice beams that form the roof grid and the downstage/upstage edge beams.

Curved roof profiles (aluminium arcs)

6061-T6 aluminium arcs that give the roof its shape and carry the canopy, with dedicated front, mid, rear and edge profiles.

Roof support members (struts and ties)

Q355B compression struts and tie links that triangulate the roof plane and transfer the canopy load back into the columns.

Bases (foundation shoes)

20a H-beam shoes that spread the leg load into ballast or venue slab and provide the reaction seat for the lifting cylinder.

Lifting cylinders and canopy

The 45 t electric cylinder with guide sleeve and square socket, plus the tensioned PVC-coated fabric roof.

 Fig. 1 - The complete 80 × 24 × 26 m roof erected in the factory yard. The entire structure was assembled before dispatch so that every pin, ear plate and cylinder was proof-fitted under load.

page-1320-624
page-1308-607
page-1065-495

Fig. 2 - Curved 6061-T6 aluminium profiles installed over the steel grid, carrying the tensioned canopy. The arch is formed by the purlin profile itself, so no separate curved truss is needed.

 

page-1223-594

 

Why steel instead of aluminium box truss for an 80 m span

 

An 80 m clear span is where aluminium box truss stops being economic. Deflection, not strength, drives the design: an aluminium roof at this span needs either a deep cable-assisted truss or an intermediate support grid, both of which add truck space, crew hours and rigging complexity.

This system takes the opposite approach - a heavier, shorter-member steel portal that is transported in 1 m / 2 m / 4 m pieces and assembled at ground level:

Design parameter

Heavy steel portal (this system)

Aluminium box-truss roof at 80 m

Span strategy

80 m clear, self-supporting portal

Requires towers, cables or intermediate legs

Member size for transport

1 m columns, 2–4 m beams

Long truss spans (3–4 m sections, more of them)

Height adjustment

Powered, 1,200 mm per cycle

Manual tower blocks / hoists

Structural proof

Full-scale static load test + mill certs

Usually design calculation only

Wind documentation

AS/NZS 1170.2 model, 15 load cases

Varies by supplier

Repair strategy

Replace one 1 m module

Replace a full truss length

The trade-off is honest: steel modules are heavier per piece than aluminium, so you need plant on site - but you need far fewer high-altitude crane picks, and the roof plane is complete before anyone works at height.

Fig. 3 - Ground-level assembly. Column and beam modules are pre-pinned in rows and lifted into the portal position, so the roof grid is closed before the canopy goes on.

Fig. 4 - Roof grid closed over the stage footprint. Because the frame is a portal, the arena floor between the legs stays clear for the stage, PA and video.

 

The 45-tonne lifting cylinder: how the roof climbs 1.2 m at a time

 

The single most useful feature on a 26 m roof is not the span - it is being able to change the trim height without re-rigging.

Each leg base carries a 45 t thrust electric cylinder with a 1,200 mm stroke, guided by a sleeve and square socket. The sequence is mechanical and repeatable:

1. The cylinder extends and lifts the column stack clear of the base by up to 1,200 mm.

2. Rotating hooks swing into the ear plates of the column unit and lock the lifted stack in position.

3. The next 1 m column module is inserted and pinned at the now-accessible joint.

4. The cylinder retracts, the hooks release, and the cycle repeats.

Two consequences matter commercially. First, the roof can be raised in 1 m increments to match a venue's trim height, sightline or video-wall clearance - no custom-length legs, no cutting, no re-certification for every venue. Second, the same cylinder set lowers the roof at load-out, so derig follows the build in reverse with the same plant and the same crew size.

page-1293-555

Fig. 5 - Roof edge at full height. The canopy and perimeter truss sit on 1 m column modules raised by the cylinder/hook cycle, leaving clear height for LED screens, PA hangs and sightlines.

 

Load testing: what TÜV Rheinland actually witnessed

 

A marketing claim is not a structural proof. This roof was fully erected and statically load-tested with TÜV Rheinland on site, under report CN23NAHQ 001 (order dated 12 December 2023, test performed 14 December 2023, Yixing).
The test method was staged, distributed loading - not a single proof pull:
Stage Distributed load Total applied load
1 100 kg/m² 34.1 t
2 200 kg/m² 68.2 t
3 300 kg/m² 101.2 t

Load was applied in 550 kg increments over 1.2 m × 1.2 m areas, matching a realistic point-load pattern rather than a uniform water bag. Deformation was tracked at 39 survey points across the chords, roof plane, column joints and bases.
Results: at the full 101.2 t stage, maximum measured displacement was 40.2 mm and 42.2 mm at the two governing survey points, with no visible deformation or collapse of any member, joint or base. The structure returned elastically after unloading.
Two honest caveats, because Australian venue engineers will ask:

  • The test was performed on the assembled roof structure at a 10 m test-rig height - the purpose was to validate member and joint behaviour under the design imposed load, not to substitute for a site-specific engineer's certification at 26 m.
  • Foundation, ballast, tie-back and venue-slab capacity remain project-specific. The test proves the structure; it does not prove your slab.

 

Material traceability: Q355B, tested to European standards

 

Every heat of steel in the roof is backed by a third-party test report issued by the Jiangsu Provincial Institute of Special Equipment Safety Supervision and Inspection (report series GQ-WT-2023-L344x / C3447, dated 16 October 2023). Testing followed BS EN ISO 6892-1:2019 for tensile properties and BS EN ISO 148-1:2016 for Charpy impact - European methods, which is what makes the data readable to an Australian or European engineer.

Tensile results (Q355B):

Component

Section

ReH (MPa)

Rm (MPa)

Elongation A (%)

Column / beam chord

H200 × 200 × 12 × 8

406

602

27.0

Secondary member

H150 × 150 × 10 × 7

386

561

28.5

Main chord

SHS 100 × 100 × 5

411

567

29.0

Web / diagonal

SHS 60 × 60 × 5

427

546

29.5

Charpy V-notch impact, tested at 20 °C:

Component

Section

Impact energy (J)

Requirement (J)

H-beam

H200 × 200 × 12 × 8

30.9 / 30.5 / 31.2

≥ 17

H-beam

H150 × 150 × 10 × 7

25.6 / 25.2 / 25.5

≥ 17

Main chord

SHS 100 × 100 × 5

22.4 / 22.7 / 23.0

≥ 8.5

Web / diagonal

SHS 60 × 60 × 5

30.4 / 27.1 / 29.7

≥ 8.5

Base plate

Plate t = 20 mm

159.0 / 143.9 / 130.0

≥ 34

Base plate

Plate t = 30 mm

214.9 / 212.3 / 208.4

≥ 34

All results exceeded the specification minimums with margin - the lowest chord impact value (22.4 J against an 8.5 J requirement) is 2.6× the acceptance threshold, which is the kind of reserve that matters when a roof is assembled and disassembled dozens of times over a tour.

The 6061-T6 aluminium roof profiles are supplied with their own mill certificates, and the complete material dossier - mill certs, third-party tensile and impact reports, and the TÜV test report - travels with the roof as a single document pack for the venue's engineer.

 

Wind engineering to AS/NZS 1170.2:2011

 

Australian venue approval lives or dies on wind documentation, so the frame has been modelled against the Australian standard rather than a generic European load case.

Wind design parameter

Value

Standard

AS/NZS 1170.2:2011

Site region

Region A1 (NSW)

Terrain category

TC3

Reference height (z)

26 m

Average structure height

26 m

Annual probability / ARI

1 year

Maximum wind speed (design)

30 m/s

Operational wind speed

21 m/s

Site wind speed Vdes,θ

30 m/s

Design wind pressure p

0.54 kPa

Load cases analysed

15 (dead, imposed, max wind X/Z, roof wind, operational wind X/Z and combinations)

Three analyses were run on the full frame model:

1. Static analysis of the 15 load cases, including separate maximum-wind and operational-wind cases on both principal axes plus a dedicated roof wind case - because on a 1,920 m² canopy, uplift governs, not lateral push.

2. Linear buckling analysis across all load cases: the lowest buckling factor returned was 4.369, i.e. the frame reaches instability only at more than four times the applied design load combination.

3. Member design check to AS 4100:2020, run member-by-member with utilisation colour-mapping so overstressed members are visible before the model leaves the office.

That third step is where a supplier either earns or loses credibility: member utilisation is only meaningful when the base fixity, ballast, guy/tie-back arrangement and rigging loads are the real ones. For a touring roof, those change per venue, so the AS 4100 check is issued per deployment - the generic model defines the envelope, the project report closes it out.

 

Site logistics: why modular wins on a stadium load-in

 

Stadium load-ins are won or lost on access, not on paper capacity. The 80 × 24 × 26 m roof is deliberately broken into the smallest sensible pieces:

1 m column modules - a 26 m leg is 26 identical lifts, each handling by forklift, telehandler or a small crew at ground level. No 26 m crane pick, no long over-dimensional load.

2 m and 4 m beam units - a range that lets you match available plant and roof-grid spacing rather than being locked to one length.

Common pin connections - the same pins and ear plates are used across columns, beams and roof struts, so a lost pin is a stock item, not a fabrication job.

Stackable, container-friendly geometry - lattice modules nest flat; the roof profiles and canopy travel separately and are installed last, off the critical path.

Powered height adjustment - no scaffolding tower to change trim height between venues.

For a promoter, that translates into a build that is linear rather than specialist: bases, columns, beams, roof plane, profiles, canopy - each stage uses the previous one as access, and each stage is inspectable before the next begins.

page-1324-608

 

Fig. 6 - Arena deployment: the 80 m portal spans the full stage footprint, so the floor between the legs stays clear for the stage, PA and video build.

 

How this compares with a conventional stage roof package

 

Requirement

Heavy steel modular roof (80 × 24 × 26 m)

Typical 20–30 m aluminium stage roof

Clear span

80 m

20–30 m without extra towers

Roof area

≈ 1,920 m²

≈ 300–600 m²

Structural evidence

Full-scale 101.2 t static test + 39-point survey

Design calculation only

Material evidence

Heat-level tensile + Charpy reports

Mill certs on request

Wind documentation

AS/NZS 1170.2 model, 15 cases, buckling factor 4.369

Often generic or venue-specific calc

Height change

Powered, 1,200 mm per cycle

Manual blocks / different leg set

Transport profile

1 m / 2 m / 4 m modules

3–4 m truss lengths

 

 

page-800-450

 

Frequently asked questions

 

Q: What is the maximum clear span of this concert roof?

A: 80 m clear span, 24 m depth and 26 m height, giving approximately 1,920 m² of covered stage area with no intermediate support inside the portal.

Q: What steel grade and sections are used?

A: Q355B to GB/T 1591-2018. Main chords are 100 × 100 × 5 mm SHS, webs and diagonals are 60 × 60 × 5 mm SHS, and column diagonal bracing is 48 × 3 mm round tube. H-beam sections (H200 and H150) are used where local bending governs.

Q: Has the roof actually been load tested?

A: Yes. The fully erected structure was statically tested under TÜV Rheinland supervision (report CN23NAHQ 001, 14 December 2023) in three stages to a total imposed load of 101.2 t (300 kg/m²), with deformation tracked at 39 survey points. No member, joint or base showed visible deformation or collapse; maximum displacement at full load was 40.2 mm and 42.2 mm.

Q: What wind speed is the roof designed for?

A: The frame has been modelled to AS/NZS 1170.2:2011 for a NSW Region A1 site, terrain category 3, 26 m reference height, 1-year ARI: 30 m/s maximum wind, 21 m/s operational wind, design wind pressure 0.54 kPa.

Q: How does the roof reach 26 m without heavy crane picks?

A: Each leg base carries a 45 t thrust electric cylinder with a 1,200 mm stroke. The cylinder lifts the column stack, rotating hooks lock into the column ear plates, the next 1 m column module is pinned in, and the cycle repeats - 1.2 m of height per cycle.

Q: What covers the roof?

A: Curved 6061-T6 aluminium profiles form the arch and carry a tensioned PVC-coated fabric canopy. Because the arch is in the profile rather than a separate curved truss, the roof plane stays light and the canopy installs last.

Q: Is the roof certified for Australian venues?

A: The material and load evidence is third-party (TÜV Rheinland plus an accredited Chinese inspection institute testing to BS EN ISO 6892-1 and BS EN ISO 148-1), and the wind and member checks follow AS/NZS 1170.2:2011 and AS 4100:2020. Site certification is issued per venue, because ballast and tie-back conditions are venue-specific.

Q: Can the system be customised - different span, height or branding?

A: Yes. The modular logic (1 m columns, 2 m / 4 m beams, common pins) allows span, depth and height to be re-configured, and canopy branding or projection surfaces can be integrated into the roof profiles at design stage.

 

Standards, reports and references

 

AS/NZS 1170.2:2011

Structural design actions, Part 2: Wind actions (Standards Australia). Basis of the wind model: Region A1, TC3, 26 m, 30 m/s.

 

AS 4100:2020

Steel structures (Standards Australia). Member design check method used in the frame analysis.

 

TÜV Rheinland report CN23NAHQ 001

Static load test, concert roof truss, 14 December 2023, 101.2 t total imposed load.

 

BS EN ISO 6892-1:2019

Metallic materials, tensile testing at ambient temperature. Used for all ReH / Rm / elongation results.

 

BS EN ISO 148-1:2016

Charpy V-notch impact test. Used for all impact energy results at 20 °C.

 

GB/T 1591-2018

High strength low alloy structural steels. Source specification for Q355B.

Getting the documentation pack before you commit

 

If you are pricing a stadium roof for an Australian tour, ask any supplier for four things and compare them side by side: the static load test report with survey point count, the heat-level tensile and impact reports in EN format, the wind model with region, terrain category and design pressure stated, and the member check code and version. A supplier who can produce all four - as SZ Group (SZGROUP) does for this 80 × 24 × 26 m system - has already done the work your venue engineer will ask for.

SZGROUP supplies the complete package: structure, 45 t lifting cylinders, curved 6061-T6 profiles, canopy, bases, and the full certification dossier - shipped as modular, container-friendly kits and assembled with standard plant.

 

page-1319-613

 

If you are pricing a stadium roof for an Australian tour, ask any supplier for four things and compare them side by side: the static load test report with survey point count, the heat-level tensile and impact reports in EN format, the wind model with region, terrain category and design pressure stated, and the member check code and version. A supplier who can produce all four - as SZ Group (SZGROUP) does for this 80 × 24 × 26 m system - has already done the work your venue engineer will ask for.

SZGROUP supplies the complete package: structure, 45 t lifting cylinders, curved 6061-T6 profiles, canopy, bases, and the full certification dossier - shipped as modular, container-friendly kits and assembled with standard plant.