Curved Dome Steel Truss System
Saudi Arabia Concert Project - Five-Frame Arc Dome Truss with I-Beam Bases and Tarpaulin Cover (custom-engineered, 2022)
At a Glance
Product type: curved dome steel truss - a heavy-duty arc roof truss system for concert stages and large outdoor events.
Project: custom-designed in 2022 for a concert client in Saudi Arabia; load tested by German TUV.
Configuration: five curved truss frames connected together and mounted on steel I-beam bases as one integrated dome.
Size in the 2022 assembly drawings: 60,347 mm span, 28,338 mm height, 29,965 mm overall width.
Load capacity: a two-frame assembly carries 110 t the whole structure can carry 275 tons.
Covering: tarpaulin can be installed over the top and along the sides.




1. Product Overview
1.1 Product full name
Curved Dome Steel Truss System - heavy-duty arc roof truss (concert dome truss / curved steel roof structure).
1.2 System name
Saudi Curved Dome Truss Solution - a five-frame arc dome truss on I-beam bases, engineered for concert stages and large-scale outdoor events.
1.3 Category
Stage roof truss / curved dome truss / heavy-duty lighting, audio and LED suspension structure / covered event structure.


1.4 Core positioning
A large-span curved steel truss dome built for concert main stages, music festivals, government celebrations and large outdoor events. Five curved truss frames are connected together and fixed onto steel I-beam bases to form one integrated dome, and any two frames joined together form a load-tested unit carrying 110 t. This is what makes a structure of this size practical: it is tested, transported, assembled and approved in stages, while behaving as a single dome in service.
1.5 One-line value proposition
Source-factory custom production - we deliver the complete structural solution: 3D design, structural calculation, manufacturing, load testing, on-site technical coordination and bulk supply.
2. Why Choose Us
• Original manufacturer with more than 20 years of experience in stage truss, barriers and scaffolding for the event industry.
• Professional engineering team delivering the whole solution - from 3D design and structural calculation to finished products, installation guidance, delivery and storage.
• Products pass German TUV weight load testing, including this Saudi curved dome project.
• Custom engineering for very large spans that standard catalogue truss cannot cover.
• On-site installation guidance, or we can dispatch our own teams to support erection for large projects.
• Long-term bulk supply and spare parts support for rental and staging companies.



3. Key Technical Parameters
3.1 System configuration
The Saudi dome is a five-frame system. Each frame is a curved (arc) triangular truss. The five frames are connected one by one and fixed onto steel I-beam bases, so the whole assembly works as one integrated dome. Because the system is modular, a partial structure - for example a single frame or a two-frame unit - can be erected, tested or demonstrated on its own.

3.2 Overall dimensions
|
Item |
Value |
Source |
|
Overall arch span |
60,347 mm |
2022 assembly drawing, front elevation |
|
Overall arch height |
28,338 mm |
2022 assembly drawing, front elevation |
|
Overall structure width |
29,965 mm |
2022 assembly drawing, side elevation |
|
Curved truss frames |
5 frames |
Project configuration |
|
Load-tested unit |
2 frames connected |
TUV load test |
|
Load capacity of the two-frame unit |
110 t |
TUV load test |

3.3 Load capacity and testing
• A two-frame assembly of this system carries 110 t.
• The system was load tested by German TUV; the test report can be supplied for engineering review and event approval.
• The load figure applies to the tested unit configuration. For other frame counts, spans and suspension arrangements, our engineering team calculates the allowable uniformly distributed load and the concentrated suspension load, and confirms the matching truss section and tube specification.
• Rated loads must never be exceeded in service.


3.4 Truss structure and material
• Frame type: curved triangular truss with internal diagonal bracing, as shown in the 2022 assembly drawings.
• Main structure: steel. The steel grade and tube specification are confirmed by structural calculation for each project, so that the heavily loaded members and the lighter members are matched to their actual stress.
• Bases: steel I-beam bases at the arch feet transfer the frame loads into the foundation and hold the frame geometry.
• Frame radius, section size and member sizes are produced to project drawings.





3.5 Connection method
• The system is fully modular: the dome is delivered as individual curved frames, I-beam bases and bracing members, and connected on site.
• Frames are joined to each other and to the I-beam bases with structural connectors (connection plates, bolts and pins), so the same components can be assembled, dismantled and reused.
• Inter-frame bracing keeps the five-frame dome square and stable during assembly and in service.
• Accessory list: connection plates, bolts and pins, I-beam bases, end caps and diagonal braces.
3.6 Roof and side covering
• Tarpaulin (PVC-coated fabric) can be installed over the top of the dome and along the sides, turning the truss into a fully covered event structure.
• The curved form gives a smooth covering surface with fewer wrinkles and better rain run-off than a flat roof.
• The covering is fixed to the frame line while the structure is at working height, which reduces high-altitude work.
• Side sheeting can be partly opened, fully closed or removed on the windward side, depending on the wind and privacy requirements of the event.
3.7 Transport and assembly units
• The dome is supplied as modular frames, I-beam bases and bracing members for standardized packing and container transport.
• The shipping breakdown is agreed with the client against the transport plan and the site assembly sequence.
• Partial assemblies (one or two frames) can be built for testing, staff training or smaller events.
3.8 Safety factor
Members are engineered to a safety factor of 1.5 to 2.0 - a point that government projects and large performance clients always review.
4. Materials and Production Process
4.1 Raw material control
All raw material we purchase comes with an inspection report that proves high quality, and our QC team also tests the material when it arrives at our factory.
4.2 Processing flow
Tube cutting - CNC drilling - welding (robot welding or manual full welding) - weld grinding - pre-treatment - surface treatment - final inspection.
4.3 Surface treatment options
Our factory's standard corrosion-resistant treatment for rental-duty truss is cathodic electrophoresis, which bonds tightly to the steel and performs far better outdoors than ordinary powder coating. For a large outdoor dome, coating performance is a contract-critical item, so the final coating system, colour and dry-film thickness are confirmed with the client at order stage.
|
Feature |
Cathodic electrophoresis |
Ordinary powder coating |
|
Corrosion resistance (outdoor) |
High, anti-rust |
Lower, prone to rust |
|
Wear resistance |
High, scratch resistant |
Lower |
|
Paint adhesion after repeated assembly |
Does not peel easily |
Peels off more easily |
|
Best fit |
Rental companies with repeated deployment |
Light indoor use |
4.4 Factory advantages
• In-house tube cutting, CNC drilling, welding, grinding and surface treatment lines.
• Robot welding or manual full welding, selected according to the member and its load case.
• Every large structure is checked against the drawing before packing.
• Production capacity for bulk orders and long-term supply programmes.
5. Structural Verification and Safety Instructions
5.1 Structural calculation
All structures are personally calculated by our engineers, who carry out stress analysis and provide analysis reports. This is the soul of an engineering solution - organisers, staging companies preparing approval submissions, and government tenders all review it.
• Combination check of wind load, self-weight and suspended load (a simple statement can be issued by our cooperating structural engineer).
• Allowable uniformly distributed load and concentrated suspension load at the project span - the figures engineering teams care about most.
• Verification summary for the as-built covering configuration, with and without side sheeting.
5.2 Third-party load testing
The Saudi curved dome project was load tested by German TUV. A two-frame assembly carries 110 t. The test report can be supplied for client, engineer and authority review.
5.3 Covered structure - extra wind consideration
• Once the top and the sides are covered with tarpaulin, the structure becomes a large wind-catching surface, so wind load must be assessed for the covering configuration that will actually be used.
• The allowable wind speed for erecting, using and dismantling the covered structure must be defined and agreed before the event.
• Side sheeting should be opened or removed when wind speed approaches the defined limit.
• Ground anchoring - ballast or foundation - must be confirmed against the site's soil and wind conditions, not assumed.
5.4 Applicable conditions
• Concert main stages, music festivals and cultural events with a defined wind limit.
• Outdoor and semi-permanent installations where the structure is anchored and inspected before use.
• Structures operated within the rated load and within the approved covering configuration.
5.5 Prohibited conditions
• Never exceed the rated load, and never suspend equipment in a non-standard way.
• Never erect without proper procedures, ground anchoring and a validated assembly plan.
• Never keep the structure in service in wind above the defined limit, especially with the side sheeting closed.
6. Application Scenarios
Do not limit the coverage to a single product page. Split the scenarios into separate solution pages so that each customer search term is covered by its own page, with the fit description and matching images.
6.1 Concert main stage dome roof
Scenario demand: a large clear span that carries line-array loudspeakers, moving lights and LED screens above the performance area, with rain and sun protection for the stage. Recommended configuration: five-frame curved dome on I-beam bases, tarpaulin top cover, with audio, lighting and LED loads distributed across the frames according to the calculated suspension plan.
6.2 Music festival and cultural event covered structure
Scenario demand: a covered area for stages, seating, VIP zones or food and beverage areas within a festival site. Recommended configuration: partial or full dome with side sheeting, sized to the site plot and the audience capacity.
6.3 Government and national celebration ceremonies
Scenario demand: a large, formal ceremonial structure delivered with approval documentation. Recommended configuration: full dome with the agreed covering, plus structural verification documents for public security and cultural-tourism approval.
6.4 Exhibition, product launch and ceremony dome
Scenario demand: an architectural-looking covered space for launches, exhibitions and award ceremonies. Recommended configuration: full dome with the side sheeting open or closed as required.
6.5 Sports event opening and closing ceremonies
Scenario demand: high clearance for large-screen suspension and aerial rigging. Recommended configuration: five-frame dome with concentrated suspension points calculated for the screen and rigging loads.
6.6 Semi-permanent shaded venue for hot climates
Scenario demand: shade and rain protection across a long outdoor season in a high-temperature region. Recommended configuration: dome on I-beam bases with full tarpaulin covering, anchored to a permanent or ballasted foundation.
7. Installation Node Solutions
The sequence below follows the logic of the modular five-frame system: build the reference geometry, complete one load-tested two-frame unit, then extend the same procedure until the dome is closed and covered.
Step 1 - Site survey and setting out
Establish the centreline, the arch span and the position of every frame. The I-beam bases, the frames and the bracing are all positioned from this reference line, so any error introduced at this stage propagates through the whole dome.
Step 2 - Install the foundation and the I-beam bases
Install the steel I-beam bases at the marked positions and check level, alignment and anchoring. The bases transfer the frame loads into the foundation and define the geometry of the dome.
Step 3 - Erect the first curved frame
Assemble and raise the first curved truss frame on its two bases. This frame sets the plane and verticality that all remaining frames follow.
Step 4 - Erect the second frame and complete the tested unit
Erect the second frame and connect it to the first with the bracing members. The two-frame unit is the configuration that was TUV load tested at 110 t, and it is the first structurally complete unit of the build sequence.
Step 5 - Erect the remaining frames
Erect and connect the remaining frames one by one, following the same procedure, until all five frames are in place. Each new frame is restrained to the previous one as it is added, so no frame is left unsupported at any stage.
Step 6 - Complete the inter-frame bracing
Install the bracing between the frames in full. This is what turns five independent arches into one integrated dome and keeps the structure square during covering and rigging.
Step 7 - Install the roof covering
Install the tarpaulin over the top of the dome and fix it along the frame line. Installing the covering while the structure is at working height reduces high-altitude work compared with covering a roof that has already been raised to its final position.
Step 8 - Install the side sheeting
Install the side covering in the configuration agreed for the event - partly open, fully closed, or removed on the windward side. Wind management for a covered dome is decided before the sheeting goes on, not after.
Step 9 - Install rigging and suspension points
Install the suspension points for lighting, audio and LED loads, and check each of them against the calculated load plan before anything is hung.
Step 10 - Final inspection before the event
Check base anchoring, all connections, bracing, covering and suspension hardware; confirm the wind limit and the monitoring procedure with the event organiser before the structure is put into service.
8. Qualifications, Testing, Delivery and Service
• Company qualifications: business license and production-related certificates.
• Product test reports: steel mechanics, load testing, and the German TUV load test report for the arc dome unit.
• Custom sizes and frame radii per project drawings, including large-span curved trusses.
• Structural documents supplied for public security / cultural-tourism event approval.
• Factory-direct supply with bulk stock support.
• Online technical briefing for engineers; on-site technical support for large projects.
• Long-term bulk supply for rental companies, with spare parts on demand.
• Packaging and logistics: standardized packing and delivery to the port of shipment or the project site.
9. Real Project Case - Saudi Arabia, 2022
Project: curved dome steel truss for a concert client in Saudi Arabia, designed in 2022 by our engineering team.
• Configuration: five curved truss frames connected together and fixed onto steel I-beam bases as one integrated dome.
• Covering: tarpaulin over the top of the dome and along the sides.
• Testing: German TUV load test; a two-frame assembly carries 110 t.
• Drawing set: front elevation, 45-degree view and side elevation, with overall dimensions of 60,347 mm span, 28,338 mm height and 29,965 mm width.
• Partial units: structures built from two connected frames were assembled and filmed during the project (project video documentation available on request).
10. FAQ
Q: 1. What is a curved dome steel truss?
A: A curved dome steel truss is a large-span steel structure built from curved (arc) truss frames that are connected together to form a domed roof. It acts as the supporting structure for concert stages and large outdoor events, carrying lighting, audio, LED screens and a tarpaulin cover above the performance area.
Q: 2. How much load can this arc dome truss carry?
A: A two-frame assembly of this system carries 110 t and was load tested by German TUV. For the complete five-frame dome, the allowable uniformly distributed load and the concentrated suspension load are calculated for the project's span, frame count and suspension arrangement.
Q: 3. How large is the Saudi dome project?
A: The 2022 assembly drawings give an overall arch span of 60,347 mm, an overall arch height of 28,338 mm and an overall structure width of 29,965 mm, built from five curved truss frames on I-beam bases.
Q: 4. Can the structure be covered with a roof and side walls?
A: Yes. Tarpaulin can be installed over the top of the dome and along the sides, so the truss works as a covered structure. Once it is covered, wind load must be assessed and a maximum allowable wind speed defined for erection, use and dismantling.
Q: 5. Can you provide a structural verification document for event approval?
A: Yes. We can supply a structural verification document per project for event approval, and for special projects we can commission a cooperating structural engineer to issue a dedicated verification file. The German TUV load test report is also available.
Q: 6. Can the dome be customised for our site and our span?
A: Yes. Span, height, frame count, base type and covering configuration are all designed to project drawings. Very large curved structures that standard catalogue truss cannot cover are our specialty.
Q: 7. Is it possible to erect only part of the dome?
A: Yes. The system is modular, and partial assemblies - for example a one-frame or a two-frame unit - can be built, tested or used for smaller events and demonstrations.
Q: 8. How is the structure transported, and what is included?
A: It is supplied as modular frames, I-beam bases and bracing members in standardized packing for container transport. Matched accessories such as connection plates, pins, bolts, end caps and diagonal braces are supplied together, and the shipping breakdown is agreed against the transport plan.
Q: 9. Can you provide technical guidance for installation?
A: Yes. We offer online technical briefings for engineers and can dispatch our own teams on site to support the erection of large structures such as this dome.
Send Inquiry

