Building a MASSIVE Concert Stage from Scratch
Apr 20, 2026
Installation Steps
Step 1: Mark & Position Layout
Mark the 4 base positions according to stage size.
Ensure the layout is square (diagonals equal).
Step 2: Install Bases & Columns
Place base plates and level the adjustable feet.
Assemble column trusses on the ground.
Attach columns to bases and fix tightly.
Step 3: Assemble AFrame Top (Gable)
Build the Aframe roof truss on the ground.
Connect all sections with pins or bolts.
Double-check all joints are locked.

Step 4: Lift the AFrame Roof
Attach lifting tools to the top of columns.
Lift the Aframe slowly and evenly at four points.
Keep the structure balanced during lifting.
Step 5: Install Braces & Guy Wires
Install horizontal and diagonal braces.
Install guy wires and ground anchors for outdoor stability.
Tighten all wires to prevent shaking.
Step 6: Adjust Verticality & Level
Column vertical deviation ≤ 1/1000.
Top truss level error ≤ 5mm.
Recheck all pins, bolts, and clamps.
Step 7: Mount Lighting & Equipment
Install lamps, speakers, and LED screens evenly.
Use safety cables for all hanging devices.
Install rain cover if needed.
Step 8: Final Inspection
Check for stability, no shaking, no noise.
Confirm safe working condition before event.
Dismantling Steps
Scene Diagrams (Scene Images)
You can use these 6 standard scene images for product catalogs or posters:
Image 1: Outdoor Concert AFrame Truss
Large music festival main stage, Aframe with lights, speakers, LED screen, rain roof.
Image 2: Outdoor Wedding AFrame Truss
Lawn wedding ceremony, simple Aframe with string lights and decor.
Image 3: Outdoor Roadshow & Launch Event
Commercial promotion stage, compact Aframe lighting roof.
Image 4: Small Outdoor Performance
Street show, pub event, lightweight portable Aframe truss.
Image 5: Rainproof AFrame Roof
Outdoor event in rainy weather, Aframe with waterproof canopy.
Image 6: Stage Backdrop AFrame Lighting
Event background lighting support, beautiful triangular roof shape.
Remove all lighting, equipment, and rain cover.
Loosen guy wires → lower the Aframe slowly.
Remove braces → separate truss sections.
Dismantle columns and bases.
Clean, check, and store parts properly.
Warning tips
NO STANDING UNDER TRUSS
DO NOT OVERLOAD
WIND ≥5 LEVEL: STOP USING
INSPECTION REQUIRED BEFORE USE